Blodgett professional INSTALLATION
Turnkey Solutions
The Blodgett Professional Installation Program is designed to offer our customers a worry free installation and start up experience when purchasing any of our Combi* or HydroVection ovens. It includes: Shipping, Site survey, Installation, Connection of Utilities and Start up. Installation is provided by Blodgett Authorized Platinum Pro Providers and is available for HydroVection and Combi ovens at time of purchase.
* Mini Combi and Hoodini models not included
Shipping
Site Survey
Installation
Utility Connection & Startup
Program Guidelines
SHIPPING
- The equipment is shipped to the Food Service dealers designated location listed on the purchase order.
SITE SURVEY
- The ASA will perform a site survey to assure all requirements for a worry free installation have been met. If there are any anomalies, the ASA will document and present them to the customer. The customer is responsible for resolving any non-compliance at the site prior to equipment delivery.
- Additional charges may be applicable for non-complianc
INSTALLATION
- The ASA will uncrate, stack if necessary, assemble stands and set in place.
- The ASA will remove and dispose of all shipping material.
- Removal and disposal of existing equipment is not included.
- The ASA will complete the final assembly of the oven.
- Installation of a water treatment system is NOT included with this program
CONNECTION OF UTILITIES
- Connect Gas: The ASA will connect the gas hose from the oven to an appropriate gas line connection.
- Connect Power: The ASA will hook up the oven to an approved disconnect device.
- Connect Water: The ASA will connect the water hose to the appropriate water feed connection point.
START UP
- The ASA will perform a Factory Start Up according to Blodgett recommended procedures.
- The ASA will complete the Start Up form.
- The ASA will send the form to Blodgett.
Customer Responsibilities
The customer is responsible for providing the following prior to installation:- A water treatment system, if required to meet the factory water quality requirements. Installation of a water treatment system is NOT included with this program.
- 1/2” treated cold water line installed within 2’ to 3’ maximum from the rear of the oven. If a water treatment system in installed, the water supply must come from that system.
- Untreated water can be used for hand shower and quench
- Electrical disconnect and/or connection point within 2’ to 3’ from the rear of the oven
- Gas Oven Only – Gas service with a shut off within 2’ to 3’ from the rear of the oven
- An approved floor drain within 2’ to 3’ from the rear of the oven
- An approved and operational ventilation hood